Watercourse screen
Culvert, screen and outfall manual, (CIRIA C786) published by CIRIA in 2019, defines a screen as: ‘An arrangement of bars, grids or poles placed in a watercourse.’
A course screen is: ‘A course screen designed to collect large debris, usually upstream of a culvert.’
A debris screen or trash screen is a: ‘Screen at the inlet of a culvert designed to prevent debris from entering the culvert and causing a blockage.’
A fish screen is: ‘A screen designed to prevent fish being washed into culverts (usually on outlets to ponds and reservoirs).’
A safety screen or security screen is: ‘A screen comprising closely-spaced bars, designed to prevent unauthorised or accidental access to a conduit or other hydraulic structure, which reduces the risk of someone coming to harm.’
A tree screen is a: ‘ Screen upstream of a culvert designed to prevent tree trunks and branches from blocking a culvert or debris screen.’
A weed screen is: ‘A screen comprising closely-spaced bars designed to prevent floating vegetation and small debris entering water intakes and pumping stations.’
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.
New measures to stop people being ripped off
Government to protect families from cowboy builders and aggressive bailiffs.
New Futurebuild showcase brings an innovation-first approach.
National Planning Policy Framework
Understanding the 2026 changes.
ECA's public affairs priorities
Member consultation opens to shape priorities for 2027 to 2030.

















